Challenge

Cyntek was engaged by a large publicly-traded client to integrate an automated material sorter into their existing operations. The equipment and process flow required modifications to accommodate the new equipment within a constrained layout.

Following the successful integration of the sorting equipment, Cyntek was engaged to perform a front-end design exercise for the expansion of the sorting system. The expansion would entail automated packaging capabilities. Following a conceptual design process, Cyntek was engaged to pursue a detailed design exercise.

Project Emphasis

  • Equipment procurement, installation, and commissioning
  • Line & Facility modelling
  • Electrical and controls integration design
  • Industrial cost engineering
  • Fixed price proposal and execution planning