Challenge
Cyntek was engaged by a large publicly-traded client to integrate an automated material sorter into their existing operations. The equipment and process flow required modifications to accommodate the new equipment within a constrained layout.
Following the successful integration of the sorting equipment, Cyntek was engaged to perform a front-end design exercise for the expansion of the sorting system. The expansion would entail automated packaging capabilities. Following a conceptual design process, Cyntek was engaged to pursue a detailed design exercise.
Project Emphasis
- Equipment procurement, installation, and commissioning
- Line & Facility modelling
- Electrical and controls integration design
- Industrial cost engineering
- Fixed price proposal and execution planning